Seattle.gov Home Page City Services Staff Directory [WEB GRAPHIC] About Seattle.gov City Contacts
Seattle.gov Home Page
 SEARCH: 
Seattle.gov This Department
Link to DPD Home Page Shaping and protecting Seattle's built and natural environment Link to DPD Home Page Link to About Us Link to Contact Us Diane Sugimura, DPD Director
  •  
  • Planning
  • Permits
  • Compliance
  • Online Tools
  • Resource Center
  •  
DPD Forms
Building Permit Forms
1.  ASC Counter Application
(replaces Subject-to-Field-Inspection form)
PDF | Word
Updated
1/6/04
 
2.  Building/Energy Code Checklist for Subject-to-Field-Inspection Permits (R-2/R-3)
PDF | Word
Updated 11/18/05
3.  Checklists & Standards
View
 
4.  Commercial Kitchen Hood Worksheet/Checklist
PDF | Word
Updated
4/15/08
5.  Construction Stormwater Control Prescriptive Plansheet
(see Temporary Erosion and Sedimentation Control (TESC) Standard Plan below)
 
6.  Contact Disclosure Form
PDF | Word
Updated
3/15/04
 
7.  Coversheet 
Used for all single family, multifamily, commercial and industrial permit applications that require plan review, including all land use permit applications (NOTE: page dimensions = 24"x36").
PDF (print only) | AutoCAD 2008 (DWG)
Updated
1/10/08
8. Dry Season Extension
Application - PDF | Word
Application Instructions - PDF | Word
 
9. Earthquake Damage Repair Permit Application
PDF | Word
Updated
3/16/04
10. Earthquake Home Retrofit Permit Application (Voluntary)
PDF | Visit Home Retrofit website
Updated
1/10/05
 
11. Earthquake Home Retrofit Planset 
3 pages; large format (30"x42")
DWG Autocad files - Page 1 | Page 2 | Page 3
PDF files - Page 1 | Page 2 | Page 3

NOTE: Printed versions of this planset are available from the DPD Public Resource Center.
For more details on earthquake retrofitting, visit our Home Retrofit website
Updated
5/02
 
12. Energy Code Forms: Nonresidential
- see Seattle Energy Code website
 
13. Energy Code Forms: Residential
- see Seattle Energy Code website
 
14. Glazing Calculation Worksheet for STFI Permits [Energy Code Prescriptive Path]
No longer required
Retired
6/21/07
 
15. Health Department application required for building permit applications that include a new food service or alterations to an existing food service facility.  
16. Lateral Design Checklist (Wind & Seismic)
under the 2003 Building Code
PDF | Word
6/25/07
17. Letter of Authorization
(used by owner to authorize an agent for permit applications)
PDF | Word
Updated
2/23/05
 
18. Mechanical Permit Application for Commercial & Multifamily Residential: Subject-to-Field-Inspection (STFI)
(for simple mechanical commercial and multifamily residential projects that don't require plan review)
Application - PDF | Word
Checklist - PDF | Word
Updated 6/15/05
19. Multifamily/Commercial Buildings STFI Checklist 
PDF
Updated
1/18/08
 
20.  Multiple Appointments Request Form
Word 
Updated
11/30/07
21 Parking Covenant 
PDF | Word
Updated
2/9/05
 
22. Potential Landslide:
Covenant - PDF
Covenant Instructions - PDF
 
23. Pre-Application Site Visit
PDF | Word
Preliminary Application - PDF | Word
5 Steps to a Successful Application - PDF | Word
Updated
7/1/08
 
24. Preliminary Application 
PDF | Word
Pre-Application Site Visit - PDF | Word
5 Steps to a Successful Application - PDF | Word
Updated
7/1/08
 
25. Presubmittal Conference
Instructions and Application - PDF | Word
Required Information - PDF
Updated
3/7/07
 
26. Request to Renew or Reestablish a Permit
PDF
 Updated
11/27/07
27. STFI Mechanical Permit
(for simple mechanical commercial and multifamily residential projects that don't require plan review)
Application - PDF | Word
Checklist - PDF | Word
Updated
6/15/05
 
28. Street Improvement: No Protest Agreement Form
(aka, Covenant Consenting to Formation of a Local Improvement District)
PDF
 
29. Subject-to-Field-Inspection Application Form
- replaced by ASC Counter Application
 
30. Target UA Calculation Form
Residential | Nonresidential (link to Seattle Energy Code website)
Updated
8/18/05
 
31. Temporary Erosion and Sedimentation Control (TESC) Standard Plan
(available in both CAD and PDF formats) 
-DWG Autocad file: full size 24"x36" (1.7MB)
-CTB files: full size | half size (6 KB each)
 (Used with CAD files to plot drawings that will automatically update the font size to the sheet size.)
-PDF file: full size 24"x36" | half size 12"x18"

NOTE: Full-size printed versions of the TESC are available from the DPD Public Resource Center.
Updated
6/04
 
32. Tree and Vegetation Standard Mitigation Plan
(See CAM 331 for instructions.)
(NOTE: page dimensions = 24"x36") 
PDF
6/21/06
     
Last Updated: July 1, 2008
Need More Help?

From DPD

  • How to Find Us
  • Contact Us
  • Research:
    Public
    Resource Center
  • Research:
    GIS mapping tool
  • Research:
    Microfilm Library
  • Client Assistance Memos (CAMs)
  • Codes
  • Online Land Use Q & A

From Other Sources

  • King County Dept. of Assessments
  • Alleys and Easements - Seattle Dept. of Transportation
  • Water Availability Certificate- Seattle Public Utilities
Department of Planning and Development (DPD)
DPD Home | About DPD | Contact DPD | Search DPD | Site Index
Seattle.gov: Services | Departments | Staff Directory | Mayor | City Council
Copyright © 1995-2008 City of Seattle Questions/Complaints | Privacy & Security Policy